Who we are?
PFAPL is jointly owned by Raipur based GR Group
and hind group via NCLT in 2021 .
Ferro alloys are produced in sub-merged arc furnaces using electro-thermic process. The main raw materials are manganese ore, fluxes like dolomite & quartz and reductants like coke, charcoal & coal. Ore which is in metallic oxide form is smelted in the furnace. The reduction reactions are endothermic and necessary heat is supplied by captive electricity through carbon electrodes in the centre of the furnace. The electricity passing through the electrode to the metal creates arc which smelts the metal forming ferro alloys of desired quality.
About Us
The Company is incorporated in January, 2008. PFAPL is operating a Ferro Alloy manufacturing unit consisting of 2 *9 MVA Submerged Arc Furnaces along with one 18 MW Captive Power Plant (CPP).
The commercial operation of the Ferro Alloy plant (1st Furnace) started from July, 2014 and the 2nd Furnace from November 2014. The total production capacity will be 30000 MT of Silico Manganese on an annual basis.
,
18MW Captive Power Plant
Jiangxi Jianglian Energy and Envionment Co. Ltd., Nanchang, Jiangxi, People’s Republic of China have manufactured the boiler. It’s a CFBC (Circulating Fluidized Bed Combustion) Boiler.
Turbine is multiple bleed, water-cooled condenser turbine from Qingdao Jieneng Steam Turbine Co. Ltd., Qingdao, People’s Republic of China.
Balance of Plant has been procured from reputed vendors like BevconWayors, Sulzer, Schneider electric, Mecgale Pneumatics, Paharpur Cooling Towers, ABB, Thermax Ltd, Emerson etc.
.

Ferro Alloy Plant
2*9 MVA submerged arc furnace capable to produce any Ferro Alloy namely Ferro Silicon, SilicoManganese, Ferro Manganese and Ferro Chrome.
The plant has been designed on basic submerged arc technology.
Major equipment’s are purchased from most reputed suppliers like Paltech, Transformers and Rectifiers India, ABB, Morakhia Copper, Kleen Air, Multi Weigh, Unicon etc.
KEY FEATURES
- 65 acres of industrial land in MUL, MIDC
- 132 kV substation for transmission of power from CPP to nearest grid
- 22 km long water pipeline drawing water from Wainganga river
- Total number workforce : 200
- In house weigh bridge, quality control laboratory and packing facilities